Jun 03 2011
Wallington High School
Wallington High School For Girls
|
|
Client: Wallington School Main Contractor: Lakehouse Engineer: Giffords Weight: 100 tonnes Duration: 3 weeks< |
|
Curved facia consisted of three radii Varying from 3.5m to 5.0m Achieved by induction bending steelwork members. |
|
B&B's scope also included the supply and installation of the metal decking permanent soffit works. |